- Salary
- Not listed
About the role
WHO WE ARE
Kunin Technologies is revolutionizing the critical mineral supply chain by implementing advanced separation technologies to capture value from overlooked resources.
Metals are everywhere, in solar panels, smartphones, electric vehicles, but as ore grades plummet globally, traditional extraction methods are failing. China dominates critical minerals markets by developing superior separation technologies that extract value from materials American mines discard as waste.
Utilizing Kunin Technologies' breakthrough performance, ion-exchange media significantly more value can be produced from each resource, reducing waste, and unlocking metal abundance.
To achieve metal abundance, humanity must bring separation science down its own Moore’s Law: fix the idiot cost index for micro and nano scale separation materials. This requires mass manufacturing novel ion-exchange media form factors which previously struggled from high costs.
THE ROLE
Group 14 metals (germanium, tin, silicon) are critical materials of the data center build-out, and Kunin is designing, guaranteeing and commissioning a group 14 metal chlorination plant overseas for an industrial partner: metal-bearing feeds from the partner's own process are converted by chlorination, purification and hydrolysis to an electronic-grade metal product, with Kunin's proprietary ion-exchange media recovering the metal from the dilute process liquors. Bench and mini-pilot process development runs in Chattanooga from December 2026 to May 2027, basic engineering issues in May 2027, the plant is built from modular skids in parallel with civil works, and commercial operation is targeted for the first quarter of 2028. The plant is built and operated by our partner; Kunin owns the process, the design package, the performance guarantee and the training of the operating team.
You own delivery of that plant: scope, schedule, cost and quality from the basic engineering package through mechanical completion, commissioning, the performance test and handover to the partner's operating team. You report to the CEO and work alongside the VP of Engineering, who owns the process design, and the partner's site team, who build and operate. You select and manage the partner-country engineering contractor and the skid fabricator, run the Class 3 capital estimate the partner's board approves, and hold the integrated schedule that ties process development, engineering, fabrication, civil works, training and commissioning to a Q1 2028 commercial operation date.