Wastewater Construction Manager (Data Center Construction) – Texas
Vernon, TXPosted
About the role
WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.
About the Role
WORLD WIDE PROFESSIONAL SOLUTIONS is hiring a Wastewater Construction Manager to support hyperscale data center builds across North Texas.
This role sits within the owner’s representative construction management team and is focused on field execution, installation oversight, and delivery of water and wastewater systems supporting mission critical facilities.
This is a full-time, long-term position with continuity across multiple projects. You will be embedded in active builds, driving execution quality, schedule adherence, and system readiness in a zero downtime environment.
Role Overview
The Wastewater Construction Manager is responsible for on-site construction execution and coordination of wastewater and water infrastructure systems.
This is a field leadership role, ensuring systems are installed correctly, safely, and in alignment with design, schedule, and commissioning requirements.
You will work closely with contractors, trades, engineers, and client stakeholders to drive installation progress, resolve field issues, and support turnover readiness.
Key Responsibilities – Construction Execution (Water / Wastewater)
Act as the owner’s representative field lead for wastewater and water systems
Oversee daily construction activities and installation of
- Wastewater treatment systems
- Industrial water handling and discharge systems
- Process piping and utility infrastructure
- Monitor contractor performance, manpower, and sequencing to maintain schedule